Industry insights / Medical devices

Prepare a medical device shipment for a traceable handover

Build a handover pack around device identifiers, manufacturer instructions, receiving checks and clear record ownership.

RLS editorial teamUpdated 3 min readPractical checklist

Build the handover pack before collection

A traceable handover connects the physical device to its shipment record and receiving location. MDA's Distribution Records guidance identifies consignee details, storage address, device identification, quantity and delivery or receipt documentation as core record information.

MDA's GDPMD requirements also address receipt verification and storage in accordance with manufacturer instructions. Use the applicable instructions to define handling; a medical device does not automatically require cold-chain transport.

Confirm these details with the sender and receiver

Turn the shipment brief into a record that can be checked at both ends:

  • List the device description or model, quantity and applicable batch, lot or serial references. Reconcile the list with the packing list before release.
  • Attach manufacturer storage and transport instructions, including environmental limits, orientation and packaging precautions where specified.
  • Confirm the delivery address, receiving contact, authorised recipient and access window. Identify any onward storage location.
  • Agree checks for packaging integrity, identifiers, quantity and environmental records where monitoring is required. Capture the date, time and people handing over and receiving.
  • Define who records damage, shortages or a handling exception, who decides the next action and how affected goods are held while that decision is made.
  • Assign responsibility for retaining the delivery and receipt records within the establishment's distribution-record procedure.

Separate delivery from installation or commissioning

For active equipment such as rehabilitation robotics, clarify whether the logistics handover ends at delivery or also includes a separately authorised installation or commissioning activity. Confirm access, handling equipment and manufacturer technical support before movement.

This checklist supports shipment preparation. The responsible establishment should confirm current Malaysian obligations and any device-specific requirements, including additional records for implantable devices where applicable.

Official references